Time Frame: September 2018 - February 2019

Enviro-Air was contracted to excavate and remove contaminated soil to a depth of 48 feet below ground level. In addition, EAT was required to excavate foundry sand from a 3-acre area and use that material as backfill in the excavation. A small TSCA PCB area was excavated, transported and disposed of at a hazardous waste factility. In addition, 12,000 tons of impacted soil were shipped to a Pennsylvania landfill. After the excavation was filled with the foundry sand, it was capped, and the entire 3 acres site was restored.