Pleasantville, NJ

Time Frame: July 2017 - December 2017

Enviro-Air was contracted to demolish two industrial buildings on the corner of an extremely busy street that was part of an old MGP site. EAT contracted an asbestos abatement contractor to remove asbestos pipe wrap, floor tiles and roofing materials. After the removal of the asbestos containing materials, interior piping and other metals were removed and shipped off-site for recycling. Over (50) 100-yard walking floor trailers of debris were loaded and shipped to a local landfill for disposal.